Suzhou Jinji Lake Avenue East Ring Road exit ramp will implement traffic control on the East Ring Road [Jinji Lake Avenue (South East) exit ramp and ground road to take temporary traffic management measures notice] due to Metro Line 5 Su Jiahang station underground continuous wall construction, for the construction site during the protection of rail safety and traffic safety People’s Republic of China, according to the relevant provisions of the "road traffic safety law", from November 17, 2016 to 30 daily 12:30-13:00 and 14:00-14:10 on the East Ring Road Jinji Lake Avenue (South East turn) exit ramp and ground road to take temporary traffic management measures, the exit ramp and Jinji Lake Avenue (East ring road to Hangzhou Star Street) on the south side of non motorized lanes and sidewalks temporarily closed to vehicles and pedestrians are prohibited from passing. The expressway vehicle can be from the modern road outlet passage; ground non motor vehicles and pedestrians can pass from the Xia Jia Bang Road, East Road vibration. During the construction of rail transit station, please the public set on the road traffic signs and markings shown in execution, pay attention to traffic safety, obey the duty personnel on-site command.相关的主题文章: